Inauguration of the Darul Aitam Road Asphalt Project in Herat’s Eighth District at a Cost of Approximately AFN 8 Million from Herat Municipality’s Development Budget
The asphalt paving and subbase construction project of Darul Aitam Road, located in the Eighth District of Herat City, has been completed at a cost of AFN 7,918,535 from Herat Municipality’s development budget. The project was officially inaugurated and opened for public use by Al-Haj Mawlawi Hamdullah Nomani, Mayor of Herat, in the presence of Engineer Mohammad Ayub Saif-ul-Jihad, Director of Technical and Professional Affairs; heads of the Mayor’s Office, Monitoring and Evaluation Department, and the Eighth District; local elders; community representatives; heads of development councils; and a number of residents of the district.
The project, covering a length of 781 meters and a width of 10.5 meters, included asphalt paving, subbase construction, and the construction of drainage channels on both sides of the road. It was completed within two months by Abad Gostar Construction and Road-Building Company.
Herat Municipality officials emphasized the importance of implementing development projects across the city, stating that such projects play a significant role in improving road conditions, facilitating the movement of citizens, and strengthening urban infrastructure.
Meanwhile, officials of the contracting company assured that the project was completed in accordance with technical standards and to a satisfactory level of quality.
Residents of Herat City’s Eighth District also expressed their satisfaction with the completion of the project, stating that the asphalt paving of the road has significantly improved transportation and accessibility for local residents.
