Inauguration of concretization work in Hammam alley, located near Eidgah road

Anonymous (not verified)
Sat, Dec 05 2020 12:53 PM
Inauguration of concretization work in Hammam alley, located near Eidgah road

The local residents of Hamam Alley (Eidgah 2) located in the fifth district of the city, in the presence of Sayed Afghan Afghan, Head of Technical and Professional Services of Herat Municipality, in a general consensus, constructed the canal, improved the electrical system and concretized their local alley.

Inauguration of concretization work in Hammam alley, located near Eidgah road

 

Latest news

Thu, Oct 15 2026 8:46 AM
Background image

Inauguration and Commencement of the Farashan Road Asphalt Project in Herat’s Tenth District at a Cost of Approximately AFN 7.5 Million.

Work on the Farashan Road asphalt project, located in the Tenth District of Herat City, was officially inaugurated and launched by Al-Haj Mawlawi Hamdullah Nomani, Mayor of Herat. The. . .

Sat, Oct 10 2026 12:41 PM
Background image

Herat Municipality and the Provincial Directorate of Guidance, Hajj and Religious Affairs Sign a Bilateral Memorandum of Understanding

A bilateral Memorandum of Understanding (MoU) was signed between Herat Municipality and the Provincial Directorate of Guidance, Hajj and Religious Affairs, following Letter No. 403. . .

BACK TO NEWS